Refine your search:     
Report No.
 - 
Search Results: Records 1-2 displayed on this page of 2
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Guideline and cautionary points for accelerator system maintenance

Ono, Ayato; Takayanagi, Tomohiro; Sugita, Moe; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu

JAEA-Technology 2021-044, 53 Pages, 2022/03

JAEA-Technology-2021-044.pdf:43.7MB

The 3-GeV rapid cycling synchrotron of Japan Proton Accelerator Research Complex (J-PARC) uses a large number of electromagnet power supplies in order to manipulate a high-intensity beam of 1 MW. These devices have been specially developed to meet the requirement to achieve acceleration of the 1-MW proton beams. Because J-PARC has been in operation for 10 years, we have to replace many parts and equipments due to failures caused by age-related deterioration. J-PARC accelerator system supplies the beams for many users, and we have to recover it as soon as possible when a trouble occurs. Therefore, if the trouble can be prevented before it happens, reduction of the user beam time can be minimized. Furthermore, it enables us to reduce additional work for operators. Maintenance is important to keep the equipments in a normal state, and makes it possible to extend the life of the equipments by detecting and maintaining the faulty parts and the aged deterioration parts at an early stage. Since all the devices requires the maintenance, there are a wide variety of maintenance methods. Some works are carried out by the J-PARC members, and some are performed by outsourcing. Ensuring safety and protecting workers are the most important issues in maintenance work. Therefore, J-PARC has rules for safety work. All workers in J-PARC have to learn and follow the rules. In addition, various ideas are being considered to enable safe and efficient work by devising ingenuity in each work. We also elaborate various ideas and processes for safe and efficient work according to the individual work conditions. In this report, we summarize the guideline and cautionary points during maintenance based on the actual case of maintenance and inspection work of the horizontal shift bump electromagnet power supply.

JAEA Reports

None

PNC TJ1533 96-005, 199 Pages, 1996/03

PNC-TJ1533-96-005.pdf:7.37MB

no abstracts in English

2 (Records 1-2 displayed on this page)
  • 1